Work control coordinator (nuclear)Salary, qualifications, career path and hiring demand, 2026 edition

A work control coordinator nuclear vacancy involves deciding what work happens on a running reactor and when. Every job requires equipment taken out of service, every isolation reduces redundancy in nuclear facilities, and the combination of jobs running simultaneously determines how much margin the plant retains. This role builds the efficient schedule that maintains safety and operational precision.

Nuclear-specificSOC 13-1082Online scheduling · Clearances · Risk managementHigh hiring demand
In short

Nuclear work control coordinators in the nuclear industry earn a median salary of around $105,000 in the United States and roughly £50,000–£65,000 when established in the UK, rising past £92,000 at senior level.

No degree required. What gates the work is strong plant knowledge plus site qualification in nuclear work control and clearance systems, which are plant-specific and take months to develop.

US median annual base, TRX market analysis 2026
$0
UK nuclear workforce, against a 120,000 target for 2030
0people
Additional UK skilled workers the sector must recruit
0by 2030
Of UK nuclear employers reporting difficulty filling critical roles
0%
Role snapshot

The role at a glance

Everything an employer will ask about in the first fifteen minutes of a screening call.

Work Control Coordinator Vacancies
Also called
Work week manager · online scheduler · work management coordinator · clearance coordinator · work control specialist
Entry qualification
No degree required. Most coordinators come from maintenance, operations or planning backgrounds with strong plant knowledge.
Typical entry pay
$76,000–$92,000 (US) · £32,000–£41,000 (UK entry)
Senior pay
$138,000–$158,000 (US) · £74,000–£92,000 (UK senior coordinator)
Contract day rates
£440–£600 for nuclear work control; £540–£740 for online risk management and clearance coordination outside IR35; $82–$135/hr on US work control support
Professional gate
No licence. Site qualification in the work control and clearance systems is the practical gate, and it is plant-specific.
Security
UK BPSS minimum, SC common. US: unescorted access authorisation under 10 CFR 73.
Where the work sits
Operating utilities, fuel-cycle operators and decommissioning sites. Site-based, working closely with the control room.
Travel
Low. Site-based, since the qualification and the plant knowledge are specific to one station.
TRX segments
Operating fleet · Decommissioning & dismantling · Fuel handling & fuel cycle · Large new build · Radioactive waste management · New technology development
What the job is

Six versions of the same job title

"Work control coordinator" changes with the plant: a running reactor where every isolation reduces margin, a decommissioning site where configurations change constantly, or a fuel-cycle plant with continuous processing. Note the top segment dominates. Bar shows relative hiring volume across TRX's 2026 desk activity.

Operating fleet

Building and managing the online work schedule: work weeks, clearance and isolation coordination, plant risk management from concurrent work, and the interface with the control room that authorises it. US fleet, EDF UK fleet.

ROLESWork control coordinator · work week manager · online scheduler

Decommissioning & dismantling

Work control on decommissioning sites, where plant configuration changes continuously and clearances must reflect a facility that is progressively being taken apart. Sellafield, Magnox fleet.

ROLESWork control coordinator (decommissioning) · clearance coordinator

Fuel handling & fuel cycle

Work control at fuel-cycle facilities, coordinating maintenance around continuous processing and managing isolations on chemical as well as nuclear systems. Sellafield, Urenco.

ROLESWork control coordinator (fuel cycle) · maintenance scheduler

Large new build

Establishing work control and clearance systems for a new station, which must be operating properly before the plant does. Hinkley Point C, Sizewell C.

ROLESWork control coordinator (new build) · work management specialist

Radioactive waste management

Work control for waste treatment and storage facilities, coordinating maintenance around processing operations.

ROLESWork control coordinator (waste) · maintenance coordinator

New technology development

Defining work control models for SMRs, including how concurrent work is managed across multiple units on one site. Rolls-Royce SMR, X-energy.

ROLESWork control specialist (SMR) · work management coordinator
A working day

What the week actually looks like

A composite day for a work control coordinator at an operating station. Day role working on a rolling work week cycle, in constant contact with the control room. Emergent work disrupts the cycle continuously — noted below.

Work control · typical TuesdaySite-based, day role
07:45
Today's workConfirming what is starting today, that clearances are in place, and that nothing has changed overnight which stops a job going ahead, ensuring compliance with safety and operational standards.
08:30
Plant meetingRepresenting work control in the station's daily coordination: what is running, what is at risk, and what needs operations to act, fostering teamwork and communication across the department.
10:00
Plant risk assessmentThe defining task. Assessing what the combination of jobs in progress does to plant redundancy and margin, contributing to overall plant efficiency and safety culture.
11:30
Clearance coordinationWorking with operations and technicians on isolations: what needs to come out of service, in what order, and how equipment is returned safely afterwards, maintaining quality and accountability.
13:30
Forward work weeksBuilding the schedule for coming weeks, since work control operates on a rolling cycle with each week planned well ahead, preparing for future challenges and resource allocation.
15:00
Emergent workFitting in work that was not planned, which means deciding what moves and whether the risk position still holds, demonstrating the ability to adapt and assist in dynamic environments.
17:00
RecordsIssuing schedule updates and clearance documentation, since work control records are how the plant's configuration is tracked, ensuring accurate oversight and documentation in accordance with best practices.
The risk is in the combination, not the individual job. Any single job on a running nuclear plant is assessed and controlled with strict adherence to safety protocols and engineering standards. The harder question is what happens when several isolations and maintenance tasks are in progress simultaneously: two isolations that individually reduce mechanical or electrical redundancy may together remove it entirely, and a job that is safe on Tuesday may not be safe alongside the one starting Wednesday. Work control coordinators exist to see that aggregate risk picture, which nobody managing an individual job is positioned to see, and it is why the role sits close to the control room rather than within maintenance. This limited but critical exposure to plant operations makes the coordinator a key leader in maintaining operational safety and compliance within the nuclear community.
Pay, 2026

What nuclear work control coordinators are paid in 2026

Bars show the 25th to 90th percentile of base salary. The vertical marker is the median. Switch currency to move between the US and UK markets — they behave differently, and the shapes tell you why.

Base salary by level · excludes outage overtime
$0$48k$95k$143k$190k
Assistant work control coordinator0–3 yrs
$82k
Work control coordinator3–8 yrs
$100k
Senior work control coordinator8–14 yrs
$124k
Lead coordinator / work week manager14+ yrs
$146k
Work management supervision15+ yrs
$155k
25th–90th percentileMedianTRX market analysis, Q3 2026

How work control compares to adjacent roles

US national medians. The project management specialist median is BLS OEWS May 2025; the specialism ranges are TRX market analysis.

OccupationMedianP10P90What moves the number
Work control coordinator (nuclear)$105,000$76,000$158,000Plant knowledge, risk management depth, clearance authority, clearance
Project management specialists (all industries)$100,750$65,000$160,000+The nuclear premium is narrow, though the work differs substantially
Outage planner (nuclear)$112,000$80,000$168,000Outage planning rather than online work management
Radiological controls coordinator$109,000$76,000$168,000The radiological equivalent planning function

Sources: US BLS OEWS May 2025 for the coded occupations; TRX market analysis Q3 2026 for the specialism ranges. The coded comparison understates the nuclear content, since online work control involves plant risk assessment that general project scheduling does not.

Premium 01

Online risk management

Assessing the aggregate risk of concurrent work on a running reactor is the technical core of the role and takes years to do well.

Premium 02

Clearance coordination

Complex isolations on safety-related systems carry the highest consequence and require the deepest plant knowledge.

Premium 03

Safety system work

Coordinating work on safety-related equipment, where redundancy and technical specifications constrain what can be out of service, commands more.

Routes in

Three ways in, and one of them is open to everyone

Work control is entered from maintenance, operations or planning backgrounds, requires no degree, and rewards plant knowledge above all.

Route A

From maintenance or operations

Three to eight years.

Year 0Trade or technical backgroundStrong plant knowledge in nuclear power plants and chemistry is the foundation of this role.
Year 0–3Maintenance or operationsLearning the plant physically and how work actually gets done, including construction and execution processes.
Year 3–5Work control trainingSite qualification in the work control and clearance systems, gaining experience with safety protocols and risk management.
Year 5–8Established coordinatorPersonally responsible for owning work weeks and the risk assessments that go with them, maintaining relationships with operations and control room teams.
Year 8+Senior coordinator or planningDeepening in work control, typically moving into outage planning or supervisory roles, incorporating feedback from the group and respecting operational constraints.
Route B

From planning

Two to five years of experience.

Step 1Planning or scheduling backgroundFrom within nuclear or another industry.
Step 2Gain plant knowledgeWork control demands more detailed plant knowledge than pure scheduling to manage nuclear systems effectively.
Step 3Learn the clearance systemIsolations, tagging, and clearance coordination are central and site-specific, crucial for nuclear safety.
Step 4Develop risk assessment skillsUnderstanding the aggregate plant risk picture is what distinguishes this role in nuclear project management.
Step 5Qualify on siteSite assessment and qualification before working independently, fulfilling career requirements in nuclear environments.
Route C

Career changer

Twelve months to three years experience.

Step 1From maintenance planning elsewhereRefining, chemicals, and power industries run comparable work management systems.
Step 2From nuclear tradesExperienced maintenance staff move into work control regularly and bring credibility and valuable plant knowledge.
Step 3Accept the qualification periodSite-specific work control and clearance systems take months to learn properly.
Step 4Enter through an operating nuclear stationUtilities recruit work control staff steadily, offering a fulfilling career path.
Step 5SpecialiseOnline risk management, clearance coordination, and safety system clearances, where the premiums and demand in the world nuclear sector sit.
Before you apply

Are you actually ready to compete for a work control role?

Everything above tells you what the market pays and what it asks for. It does not tell you how your CV reads against the other candidates applying for the same post, and in a field where plant knowledge and clearance experience decide offers, that is the part that costs candidates the job.

Free resume scoring on avua, TRX's job search and application platform. Your score is yours — it is not shared with employers.
Example scorecardIllustrative
68out of 100

A strong scheduling CV can still miss the shortlist if it does not show clearance experience or plant risk assessment. The gap is the part you can fix.

A typical maintenance planning CV
68
Average of shortlisted candidates
79
Top decile for work control roles
91

Illustrative figures based on TRX shortlisting patterns across work control vacancies. Your own score is generated by avua from your CV and the role you are targeting.

Gates

The credentials that actually let you control work

Gated by site qualification in the work control and clearance systems, which are plant-specific and take months to learn.

CredentialJurisdictionRequired forTimeNotes
Work control system qualificationAllWorking independently6–18 monthsSite-specific; the practical gate on the role.
Clearance and isolation knowledgeAllCoordinating isolationsMonths–yearsCentral to the role and heavily plant-specific.
Plant knowledgeAllRisk assessmentYearsUnderstanding what an isolation actually removes.
Unescorted access authorisationUnited StatesSite work4–10 wk10 CFR 73 background check.
Technical specifications awarenessUSSafety system workMonthsWhat may be out of service and for how long.
Scheduling softwareAllBuilding work weeksWeeks–monthsSite work management systems.
Risk assessment competenceAllAggregate work riskMonths–yearsSite-assessed capability.
BPSS / SC clearanceUKSite access2–20 wkSC is common at licensed sites.

Work control qualifications are plant-specific and do not transfer, so moving stations means requalifying.

Skills screened

What appears on a 2026 work control shortlist

Drawn from work control specifications TRX has worked in the last twelve months. Ordered by how often a hiring manager treats it as a hard filter rather than a nice-to-have.

Hard filters

Named on the specification

  • Work scheduling — Building and maintaining the online work programme
  • Clearance coordination — Isolations, tagging and safe return to service
  • Plant risk assessment — What concurrent work does to redundancy and margin
  • Plant systems knowledge — What each isolation actually removes
  • Work management systems — The site's scheduling and permit tools
  • Control room interface — Working with the people who authorise the work
Differentiators

What decides between two shortlisted candidates

  • Online risk depth — Seeing the aggregate picture, not job by job
  • Complex isolation experience — Safety-related systems and multi-system clearances
  • Emergent work handling — Reshaping the week without losing control of risk
  • Technical specification knowledge — What may be out of service and for how long
  • Standing with operations — Being trusted by the control room
  • Outage integration — Coordinating with outage planning across the cycle
One thing candidates consistently underweight. Work control interviews assess whether you evaluate the entire work week rather than focusing on a single job. A common question: a job is properly planned, cleared, and safe, so can it proceed on Wednesday? The interviewer expects you to confirm what other work is scheduled that day, because individually safe jobs can collectively remove critical redundancy required for nuclear safety, and work control exists precisely because no single job manager can see that aggregate risk. This understanding is essential in the nuclear work control coordinator job description and highlights the importance of plant knowledge, clearance coordination, and sick days management within scheduling.
Where the jobs are

The 2026 demand map

Demand comes from operating stations managing continuous online work. Site-based with plant-specific qualification.

ProgrammeLocationPhase in 2026Engineering demand
US operating fleetNationwideOnline work managementVery high; continuous work control at every station
EDF UK fleetUKOperations and life extensionHigh; ageing plant means more online work
Sellafield & NDA estateCumbria, UKDecommissioningHigh; constantly changing plant configurations
Fuel-cycle facilitiesGlobalOperationsContinuous maintenance around processing
Global operating fleetsGlobalOperationsSustained demand worldwide
Hinkley Point CSomerset, UKToward operationEstablishing work control systems
Waste organisationsUK & globalOperationsMaintenance coordination
Magnox fleetUKDecommissioningWork control on reconfiguring plant
SMR developersUK, US & CanadaDesignMulti-unit work control models
Barakah / export new buildUAE & globalOperationsBuilding work management capability

Programme phases move. Confirm current status before making a relocation decision; TRX tracks these weekly.

Read the market this way

The online counterpart to outage planning

Outage planning gets the attention, but most work on a nuclear station happens while the plant is running, and that work is harder to manage because the reactor is operating and margin must be preserved throughout. Work control is where that happens continuously, and as plants age and online work volumes grow, the role has become more demanding rather than less.

The demographic squeeze

Plant knowledge is the constraint

Work control needs someone who knows what an isolation actually removes from service and can see the aggregate effect of several at once. That knowledge is built over years on a specific plant and does not transfer, so when experienced coordinators leave, stations lose capability that takes a long time to rebuild and cannot be recruited in from another site.

Where it leads

Adjacent and onward roles

Work control sits between maintenance, operations and planning. These are the moves TRX sees most often.

Outage plannerThe outage counterpart to online work control
Outage managerWhere work control experience often leads
Radiological controls coordinatorThe radiological planning equivalent
Nuclear plant operatorThe operations grade executing the isolations
Nuclear fission explainedThe physics of the plant you keep running, with an interactive chain reaction
Nuclear energy in the United StatesFleet, pipeline, employers and hiring in the largest nuclear market
Questions

Questions we get asked every week

How much does a nuclear work control coordinator earn in 2026?

In the United States the market runs from about $76,000 for an assistant to $105,000 at the median, with lead coordinators past $158,000. In the UK, established coordinators earn £50,000–£65,000, rising past £92,000 at senior level.

Contract coordinators bill £440–£600 a day, and £540–£740 for online risk management and clearance work outside IR35.

Do you need qualifications to be a work control coordinator?

No degree and no licence. What gates the work is site qualification in the work control and clearance systems, which takes six to eighteen months, plus unescorted access authorisation in the US.

Plant knowledge matters more than any credential.

Can you become a work control coordinator without nuclear experience?

Partially. Maintenance planners from refining, chemicals, and conventional power industries operate comparable work management systems and transfer their scheduling expertise.

However, the gap is significant: nuclear clearance systems, technical specification constraints, and the critical plant risk assessment that determines whether concurrent work is safe all must be learned on site within nuclear facilities.

Is nuclear work control a good career in 2026?

It is steady and growing, because most station work happens while the nuclear plant runs and work volumes increase as the plant ages. It is accessible without a degree from maintenance or operations backgrounds.

The honest caveat: qualification is plant-specific, so you are tied to a site, and the role is under constant pressure from emergent work reshaping a schedule you have just balanced. Nuclear work control coordinators play a critical role in ensuring compliance with safety protocols and maintaining operational efficiency in the nuclear energy sector.

What is the difference between a work control coordinator and an outage planner?

An outage planner builds the schedule for the period when the reactor is shut down, working months ahead on a defined event with a fixed scope. A work control coordinator manages work while the plant is running, on a rolling weekly cycle, where the constraint is maintaining plant margin and redundancy with the reactor at power.

Put simply, one plans work for a shutdown plant and the other controls work on a running one. Online work is more constrained because equipment cannot simply be taken out of service, and the aggregate risk of concurrent jobs must be managed continuously.

Which work control skills are most in demand in 2026?

Online risk assessment leads, because judging the combined effect of concurrent work takes years to learn and cannot be shortcut. Close behind is complex clearance experience and technical specification knowledge.

Work scheduling, clearance coordination and plant systems knowledge are the near-universal hard filters.

Nuclear only

We only recruit in nuclear. That is the whole point.

TRX works across large new build, fusion, new technology development, decommissioning, radioactive waste management and nuclear medicine, in 14+ countries. Send us your CV and we will tell you honestly which path your experience actually fits, and what it is worth.